Gas_04B / North Macedonia - Greece Interconnector

Brief project description

Main gas pipeline section Stip-Hamzali-Stojakovo (border with Greece) Within this section the following objects and systems are included: 
-Line part in length of 110 km with pipe diameter DN 700 (28")
-Pig Launching-Receiving Station DN700, 
-Valve stations -System for automatic operating with the technological process for natural gas transport (DCS/SCADA); 
-Line for connection with optic fibres; 
-Power supply system 
-Cathodic protection system 
-Security Signaling System and fire signalization. 

The Greek part of the project consists in a 24" to 28" pipeline of approximately 50 km, at a max. operating pressure of 66,5 barg linking the Nea Messimvria valve station of the Greek Gas Transmission System with the Greece/North Macedonia border at Evzoni/Gevgelija.

 